Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Plumbing and Pipefitting II |
All Resources: |
0 |
|
1 ) Calculate 11 1/4, 22 1/2, 45, 60, and 72 degree offsets, parallel offsets, and rolling piping offsets, including using a framing square to find the travel in a piping offset and using a folding rule to find given angles.
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Plumbing and Pipefitting II |
All Resources: |
0 |
|
2 ) Interpret information from a site plan to locate plumbing entry points, wall chases, material takeoff, and drain water, vent pipe, and water supply systems.
Developing estimates for installation of piping systems
Establishing piping fixture locations
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Plumbing and Pipefitting II |
All Resources: |
0 |
|
3 ) Explain the use of shoring materials and premanufactured support systems used in pipeline installation.
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Plumbing and Pipefitting II |
All Resources: |
0 |
|
4 ) Determine the grade and elevation of a trench for a sewer line.
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Plumbing and Pipefitting II |
All Resources: |
0 |
|
5 ) Identify types of underground piping materials and fittings by size and classification.
Examples: Chlorinated Polyvinyl Chloride (CPVC), Polyvinyl Chloride (PVC), ductile iron, carbon steel
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Plumbing and Pipefitting II |
All Resources: |
0 |
|
6 ) Demonstrate the installation of various drain systems.
Examples: floor, roof, other specified areas
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Plumbing and Pipefitting II |
All Resources: |
0 |
|
7 ) Demonstrate how to service various types of valves used in plumbing and pipefitting applications.
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Plumbing and Pipefitting II |
All Resources: |
0 |
|
8 ) Install a water distribution system using various hangers and fittings.
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Plumbing and Pipefitting II |
All Resources: |
0 |
|
9 ) Install a properly-sized water service line, including backflow prevention.
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Plumbing and Pipefitting II |
All Resources: |
0 |
|
10 ) Demonstrate the installation of bathtubs, shower stalls, valves, faucets, water closets, urinals, lavatories, sinks, and pop-up drains.
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Plumbing and Pipefitting II |
All Resources: |
0 |
|
11 ) Demonstrate safety precautions that must be followed when working on or near electrical equipment.
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Plumbing and Pipefitting II |
All Resources: |
0 |
|
12 ) Calculate wattage consumed by an energized circuit.
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Plumbing and Pipefitting II |
All Resources: |
0 |
|
13 ) Determine voltage, current, and resistance measurements using electrical test equipment.
Determining the position of leads for reading voltage, current, and resistance
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Plumbing and Pipefitting II |
All Resources: |
0 |
|
14 ) Identify hangers and supports used to install drainage, waste, and vent (DWV) and water supply systems.
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Plumbing and Pipefitting II |
All Resources: |
0 |
|
15 ) Install pipe hangers and supports according to local codes and manufacturer's specifications.
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Plumbing and Pipefitting II |
All Resources: |
0 |
|
16 ) Demonstrate the installation of common types of fire-stopping materials used in penetrations through fire-rated structural members.
Examples: walls, floors, ceilings
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Plumbing and Pipefitting II |
All Resources: |
0 |
|
17 ) Develop a material takeoff from a given set of piping plans.
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Plumbing and Pipefitting II |
All Resources: |
0 |
|
18 ) Determine the location of fixtures and field routing of plumbing from plans and fixture
rough-in sheets.
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Plumbing and Pipefitting II |
All Resources: |
0 |
|
19 ) Describe a building sewer system, a building drain, and a DWV system using appropriate
hangers on correct grade.
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Plumbing and Pipefitting II |
All Resources: |
0 |
|
20 ) Determine correct function by testing a DWV system.
|