Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Construction Site Preparation and Foundations |
All Resources: |
0 |
|
1 ) Identify career opportunities in the construction industry.
Examples: draftsman, engineer, construction foreman, carpenter, concrete finisher, plumber, electrician
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Construction Site Preparation and Foundations |
All Resources: |
0 |
|
2 ) Demonstrate job site safety concepts required for site preparation and foundation construction.
Examples: personal protection equipment, hand tool safety, power tool safety, electrical safety
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Construction Site Preparation and Foundations |
All Resources: |
0 |
|
3 ) Demonstrate the mechanical drawing process used in designing structures.
Identifying various mechanical drawing components
Examples: symbols, dimension lines, extension lines, hidden lines, object lines, center lines, lettering
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Construction Site Preparation and Foundations |
All Resources: |
0 |
|
4 ) Explain local building codes affecting the construction of buildings.
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Construction Site Preparation and Foundations |
All Resources: |
0 |
|
5 ) Calculate equipment and work space requirements for structures.
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Construction Site Preparation and Foundations |
All Resources: |
0 |
|
6 ) Identify factors in selecting building materials used in structures.
Examples: cost, availability, suitability
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Construction Site Preparation and Foundations |
All Resources: |
0 |
|
7 ) Formulate a bill of materials for a specific structure.
Examples: concrete, lumber, fasteners, roofing materials, hardware, electrical supplies, plumbing supplies
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Construction Site Preparation and Foundations |
All Resources: |
0 |
|
8 ) Identify positive characteristics of a building site.
Examples: proper drainage, location, orientation
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Construction Site Preparation and Foundations |
All Resources: |
0 |
|
9 ) Explain the importance of conducting property surveys for structures, including the location of property and setback lines.
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Construction Site Preparation and Foundations |
All Resources: |
0 |
|
10 ) Demonstrate building layout procedures for a specific structure.
Examples: staking, squaring, constructing batter boards, leveling
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Construction Site Preparation and Foundations |
All Resources: |
0 |
|
11 ) Explain how to lay out and construct pier, edge, and footing forms.
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Construction Site Preparation and Foundations |
All Resources: |
0 |
|
12 ) Describe the use of concrete reinforcements in structures.
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Construction Site Preparation and Foundations |
All Resources: |
0 |
|
13 ) Demonstrate the use of concrete and masonry tools in construction.
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Construction Site Preparation and Foundations |
All Resources: |
0 |
|
14 ) Demonstrate the process of mixing concrete.
Estimating the amount of concrete needed for a project
Applying various finishing techniques used with concrete
|
Architecture and Construction (2009) |
Grade(s): 9 - 12 |
Construction Site Preparation and Foundations |
All Resources: |
0 |
|
15 ) Demonstrate the process of laying block.
Estimating the number of concrete blocks needed for a project
|